| Final Map Checking | Actual Cost |
| Lot Line Adjustment | Actual Cost |
| Improvement Inspection | 2% of bonded construction costs |
| Grading Permit and Plan Check | Plan Check Actual Cost Deposit: Hillside grading - $1,500; Flatland grading - $500; Permit Fee - $53 |
| Soil Report review and Soil Testing ** | Deposit based on number of lots (minimum $500) |
| Bonds: Faithful Performance, Labor & Material, Grading & Monumentation | Varies (based on cost estimate provided) |
| Master Plan of Drainage | $14,000.00 per acre |
| Traffic Impact Mitigation (Measure M) | $1.98/sq. ft. commercial; $0.48/sq. ft. office; $0.15/sq. ft. industrial; $600 per dwelling unit |
| Eastern Transportation Corridor Fee (increases annually 7/1) | $3,542 per lot, single family residence; $2,063 per unit multi-family residence; $4.01/sq. ft. commercial |

